PSPCL’s harmonics meter plan hits a snag due to failed inspection

Power Quality Meters, meant for industrial units with a connected load of more than 100 kW, declared unfit by PSPCL’s own inspection committee Power Quality Meters, meant for industrial units with a connected load of more than 100 kW, declared unfit by PSPCL’s own inspection committee 

The post appeared first on .

Leave a Comment

Your email address will not be published. Required fields are marked *